1、開啟總電源
1. Turn on the main power supply.
2、按玻璃厚度調(diào)整上風(fēng)刀位置(干燥段四個(gè)手柄)
2. Adjust the position of the upper blade according to the thickness of the glass (four handles in the drying section).
3、在每班生產(chǎn)之前15分鐘開動(dòng)鼓風(fēng)機(jī)(控制臺(tái))
3. Start the blower (console) 15 minutes before each shift.
4、檢查水箱是否注滿水
4, check whether the water tank is filled with water.
5、開啟水泵(控制臺(tái))
5. Turn on the pump (console).
6、給海綿輥?zhàn)⑺?,使其膨脹,然后停止注?br />
6. Pour water into the sponge roller to make it expand and then stop flooding.
7、設(shè)定熱風(fēng)溫度(控制臺(tái))
7. Set the hot air temperature (console).
8、加熱器通電(控制臺(tái))
8. Heater power (console)
9、開動(dòng)毛刷輥電機(jī)(控制臺(tái))
9. Start the brush roller motor (console).
10、將玻璃板放在進(jìn)料段限位范圍內(nèi)
10. Put the glass plate in the limit of feed section.
11、開檢查照明燈(控制臺(tái))
11. Turn on the check light (console).
12、在出料段處檢查玻璃并取走
12. Check the glass at the discharging section and take it away.
13、每班生產(chǎn)結(jié)束時(shí)先關(guān)加熱器,三分鐘后關(guān)掉鼓風(fēng)機(jī)(控制臺(tái))
13. Turn off the heater at the end of each shift and turn off the blower (console) in three minutes.
14、關(guān)照明燈(控制臺(tái))
14, care for lights (console)
15、關(guān)毛刷輥電機(jī)(控制臺(tái))
15. Turn off brush roller motor (console)
16、將速度調(diào)節(jié)器降至最低位置(控制臺(tái))
16. Reduce the speed regulator to the lowest position (console).
17、關(guān)傳送輥電機(jī)(控制臺(tái))
17. Turn off the conveyor motor (console).
18、關(guān)水泵
18. Turn off the pump.
19、關(guān)總電源
19, turn off the total power supply.
本文由
移門生產(chǎn)設(shè)備整理發(fā)布,您是不是對(duì)這些內(nèi)容有所了解了呢?更多的內(nèi)容請(qǐng)點(diǎn)擊:
http://hnyfqpj.cn我們會(huì)有更多精彩內(nèi)容等你查看。
This article is published by Moving Door Manufacturing Equipment. Do you know something about it? For more information, please click: http://hnyfqpj.cn. We will have more exciting content for you to see.