設(shè)備裝有四個(gè)機(jī)頭,其左下機(jī)頭為固定機(jī)頭,左上、右上、右下為可移動(dòng)機(jī)頭,右上和右下機(jī)頭可隨移動(dòng)橫梁左右移動(dòng),可方便的根據(jù)窗框的規(guī)格進(jìn)行精確調(diào)整.橫梁移動(dòng)為手動(dòng)方式,安全方便.左上和右上可通過(guò)電動(dòng)葫蘆來(lái)調(diào)節(jié).
The equipment is equipped with four head, the left head is fixed on the head, left, right, right to the movable head, right upper and lower right head can move along with the moving beam, can be conveniently according to the specifications of the window frame adjust the moving beam. For the manual mode, the upper left and right is safe and convenient. Can be adjusted by electric hoist.
右上和左上機(jī)頭裝有速差防墜器,在緩慢升降時(shí),速差防墜器連接繩可隨機(jī)頭緩慢移動(dòng),如果機(jī)頭急速下降時(shí),速差防墜器工作,從而保護(hù)設(shè)備和操作人員的安全.
The upper right and left upper part is equipped with speed difference anti falling device. When slow rising and falling, the speed difference anti dropping connector rope can move slowly with random head. If the head goes down rapidly, the speed difference anti falling device works, so as to protect the safety of the equipment and operators.
鋁木門窗組框機(jī)主要結(jié)構(gòu)
The main structure of the frame machine for aluminum and wood doors and windows
該機(jī)由四個(gè)機(jī)頭、床身、液壓系統(tǒng)、傳動(dòng)系統(tǒng)、電氣箱等主要部分組成.
The machine consists of four main parts, such as head, bed, hydraulic system, transmission system, electric box and so on.
鋁木門窗組框機(jī)安裝與保管
Installation and storage of the frame machine for aluminum and wood doors and windows
機(jī)床運(yùn)到用戶使用地點(diǎn),如無(wú)運(yùn)輸損傷,即可使用搬運(yùn)工具將機(jī)床移至安裝位置.
If the machine is transported to the user's place of use, if there is no transportation damage, the machine can be moved to the installation position using a handling tool.
1、機(jī)床應(yīng)安裝在無(wú)腐蝕性氣體有堅(jiān)硬平坦的混凝土地面的廠房?jī)?nèi).將機(jī)床床身下的調(diào)平底座支好,機(jī)床調(diào)至水平,緊固調(diào)整螺絲的鎖緊螺母,即完成調(diào)平工作,可通電通氣試機(jī).
1, the machine tool should be installed in the workshop with no corrosive gas and hard and flat concrete floor. The leveling base under the machine bed is supported, the machine tool is adjusted to the horizontal level, the fastening nut of fastening screw is adjusted, that is, the leveling work is completed, and the ventilating test machine is available.
2、接電:三相四線 380V 50Hz
2, connection: three phase four line 380V 50Hz
3、接地:
3. Earthing:
機(jī)床床身必須接地,接地線采用黃綠雙色多股絞合軟銅體(絕緣體),其截面積為2.5平方毫米,接地后機(jī)身與主接地點(diǎn)之間的電阻應(yīng)小于0.1歐姆.
The machine tool bed must be grounded, and the grounding wire is yellow green, double colored, multi stranded, soft copper body (insulator). The sectional area is 2.5 mm2. The resistance between the fuselage and the main grounding point after grounding is less than 0.1 ohms.
4、接氣
4, air
工作氣壓0.5-0.8MPa.把氣源接在氣源處理器的接頭上,檢查氣動(dòng)系統(tǒng)有無(wú)漏氣現(xiàn)象.
The working pressure 0.5-0.8MPa. connects the gas source to the joint of the gas source processor to check the air leakage of the pneumatic system.
以上內(nèi)容是由
鋁切割設(shè)備友情提供,更多的精彩請(qǐng)點(diǎn)擊:
http://hnyfqpj.cn我們堅(jiān)持誠(chéng)信為本的經(jīng)營(yíng)綱領(lǐng),歡迎您的合作!
The above contents are provided by the friendship of the aluminum cutting equipment. More exciting, please click: http://hnyfqpj.cn, we adhere to the faith-based business program, and welcome your cooperation.